skip to Main Content

Design, engineer, fabricate and install a turnkey material handling system 2600′ long capable of 1600 TPH of FGD material from the river to the new truck loadout bin. Lincoln installed foundations, dump bin, 42″ conveyors, transfer buildings, motor control centers, truck loadout bin, and feeders.

Back To Top