skip to Main Content

CONSOL Energy Acid Mine Drainage (AMD) Water Treatment Facility

Detailed, fabricated, and installed a 50,000 square foot water treatment facility. Lincoln installed foundations, pre-engineered…

See more>>

CONSOL Energy Refuse Area Conveyor Construction

Detail, fabricate, and install 4 conveyors totaling 14,000' capable of 4250 TPH. Lincoln installed foundations,…

See more>>

CONSOL Energy Water Treatment Facility

Engineer, fabricate, and install a 90,000 square foot new water treatment facility to process mine…

See more>>

Flue-Gas Desulfurization (FGD) Project

Design, engineer,fabricate, and install a turnkey material handling system 2600' long capable of 1600 TPH…

See more>>

Murray Energy Plant Addition

Design, engineer, fabricate, and install a 16,500 square foot plant addition capable of 1500 TPH.…

See more>>
Back To Top