Mine Ventilation
Engineer, fabricate, and install mine ventilation fans including axial vane fans, bleeder fans, and mine…
CONSOL Energy Acid Mine Drainage (AMD) Water Treatment Facility
Detail, fabricate and install 50,000 square foot water treatment facility. Lincoln installed foundations, pre-engineered buildings,…
CONSOL Energy Refuse Area Conveyor Construction
Detail, fabricate and install 4 conveyors totaling 14,000' capable of 4250 TPH. Lincoln installed foundations,…
CONSOL Energy Water Treatment Facility
Engineer, fabricate and install a 90,000 square foot new water treatment facility to process mine…
Flue-Gas Desulfurization (FGD) Project
Design, engineer, fabricate and install a turnkey material handling system 2600' long capable of 1600…
Murray Energy Plant Addition
Design, engineer, fabricate and install a 16,500 square foot plant addition capable of 1500 TPH.…